Monday, September 21, 2015

Baruda 53 log cabin - Garden office near Uttoxeter

Carrying on our install updates from 2014 here is the Baruda 53 log cabin installed near Uttoxeter in April 2014.

Concrete pad mixed on site.


Cabin walls going up on day two.


Insulated with 40mm celotex between the pressure treated (70 x 45mm) floor bearers.


The completed garden office with insulation, electrics, underfloor heating and laminate flooring.



Electrics to include Garage consumer unit, double sockets in each corner, lighting and touch screen controller for the underfloor heating.




No comments: