The concrete base was prepared and laid on the Thursday along with unloading the cabin.
Friday morning and we were building the cabin.
Almost time to assemble the door frames and fit the facia boards to the window frames.
The timber pile starting to go down as we get on with the cabin construction.
Door frame and windows are in position and almost up to roof height. Our target on a cabin this size is usually to get the roof boards on ready to fit the roof shingles the following day.
Tiles are fitted hexham green in this case and finally the decorative trim is fitted to finish it off.
The completed cabin ready for electrical installation and painting.