Quite often cheaper to build and yet in our opinion they are a far more attractive and valuable addition to your property than a concrete block built garage.

View our wooden garages for sale.






The concrete base was tackled in two phases completing the central portion of the base first on day one followed by the wings and decking area supports on day two.
Cabin arrival and time to sort the timbers into their various lengths ready to start building.
Pressure treated floor bearers are laid first and damp proof membrane is attached prior to the first wall logs being positioned.
Following wall assembly the roof boards are fixed to cover the building interior



Day two of the cabin build itself and it is necessary to build the decking area to add the porch support timbers which then makes it possible to fit the remianing roof boards.



Roof complete just before another snowfall.
Ready to start work on the inside which is welcome considering the conditions outside!
50mm thick insulation for the floor.
Similarly 50mm thick insulation is added to the ceiling and plasterboard is fized to battens between the roof joists. Leaving some exposed roof joists are in our opinion a more attractive feature than boarding right over the top.
New for 2011 we now have a Winchester log cabin complete with integral central partition but in this case the partition was added as part of the installation process to create the ladies and gents toilet areas.

Under floor heating and water resistant, thick oak laminate flooring is fitted prior to adding the toilets and cubicles.